""
solarpvmodule.comPV modules, 5-730 W

Guide

A module factory that also builds the inverter

Two lamination lines, 400 MW a year, and an engineering team that specifies the inverter on the other end of the cable.

Hunan Qianyan Technology Co., Ltd. laminates PV modules in Changsha, Hunan, on the same site as our inverter and controller lines. That co-location is deliberate: a module specification and the inverter it will feed are decided together, and the temperature coefficient argument is settled by the people who build both.

Lines and capacity

Two lamination lines, 400 MW annual capacity, running PERC, TOPCon and HJT wafers from tier-one cell suppliers. We do not make cells — we buy them, test them on arrival, and laminate. That is the honest structure of the Chinese module industry at our scale, and it is why our price tracks the cell market within a week.

Where the modules go

Europe (Germany, Netherlands, Poland, Spain), Africa (South Africa, Nigeria, Kenya), South Asia (Pakistan, Bangladesh), Southeast Asia (Philippines, Vietnam) and Latin America (Brazil, Chile). Residential and commercial rooftop dominate; utility containers go to EPCs in Chile and South Africa.

How we sell

Ex-works or FOB, one pallet or a full container. Prices on this site are per module at ex-works and move with the cell market — we update them rather than quoting "contact us".

400 MWannual capacity
2lamination lines
60+export countries

Tell us what you are building

Send the specification and we reply with a sized quotation in one working day.